A. Fixed Costs
A-1) LAND of Plan
Project Site, 160 ACRES of Land (square / rectangular geometry of the most useful & effective for designing and implementing Greenhouse holds), will be used by the whole thing.
In this scheme, only the administrative area covered by greenhouses, 112 ACRES, and the rest of the building units, will be Cold Storage, Warehouse, Motor Park, Management Office, and Staff Accommodation & Recreation Space, Landscaping & Exterior (including increased capacity or other devices attached appendices supplement the project).
A-2) The Preliminary Cost of the Project
Preliminary project costs are including the costs of licensing, testing of water and soil mechanics, technical feasibility and economic design, painting, etc. The total amount of speculative buying is 144 000.00 U$D.
A-3) Building Requirements
Advanced Description:
A-4) Machinery & Equipment (Local Origin)
– The use of natural gas as fuel, the fuel tank depot, used in emergency.
A-5) Structure & Its accessories (European Source)
B. Ongoing Costs:
B-1) Cost of Energy
B-2) Estimated Cost of the Required Human Resources
B-3) Costs of Needed Inputs
B-4) Cost of Maintenance
B-5) Cost of Insurance
B-6) Depreciation Cost
B-7) Plan’s Current Spending
C. Plan’s Production & Value of Production
C-1) Annual Main Production (Classic Tomato)
Finally, per square meter, of at least 70 Kg / Year, the Classic Tomato harvest is good. In the contract, the first product to be released next year and the guaranteed purchase price for the product is correct. Price / Kg of product, equivalent to 2 U$D / Kg (Farm – Gate), has been considered.
C-2) Profit & Loss Account